News
The 223.5-tonne crane is being installed in the turbine hall of the BREST-OD-300 lead-cooled fast neutron reactor at the ...
The 223.5-tonne double-girder crane with a lifting capacity of 280 tonnes is being installed at a height of 29.6 metres.
Based on discussions with workers still inside the plant, John suspected a gantry was involved—a motorized crane that runs along an overhead rail or “gantry” that moves heavy engine components.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results