News

The 223.5-tonne crane is being installed in the turbine hall of the BREST-OD-300 lead-cooled fast neutron reactor at the ...
The 223.5-tonne double-girder crane with a lifting capacity of 280 tonnes is being installed at a height of 29.6 metres.
Based on discussions with workers still inside the plant, John suspected a gantry was involved—a motorized crane that runs along an overhead rail or “gantry” that moves heavy engine components.